References

We develop, deliver and implement global solutions with a high level of quality, for beverage industry, so that together with our clients to develop a long term partnership to support their growth.

IMG_9340Image 4IMG_4810Sebeş 08.01. Imag004IMG_5726P1050552

A. Montage and Installations, tanks and technological systems

Company

Project

Kieselmann

Carsberg Dahls Bryggeri

Norvegia 2016

Positioning and complete installation of technological piping sistem,cip station,BBT and CCT cellar.

Kieselmann

Spa Monopole SA -Belgia 2015

Positioning and complete installation of technological piping sistem,cip station

Aberle GmbH-Mercedes

Romania 2015

Assembly new line

Holvrieka

Olanda 2015

tanks assembly

EA nord Edelstahl-Analgentechnic u. Montage GmbH- Muller

Germania 2015

Positioning and complete installation of technological piping sistem

EA nord Edelstahl-Analgentechnic u. Montage GmbH

Brauerei Forst

Italia 2015

Positioning and complete installation of technological piping sistem.

Kieselmann

Spendrups Bryggery

Suedia 2015

Extension of CCT cellar.

EA nord Edelstahl-Analgentechnic u. Montage GmbH

Steinrieser Getranke

Austria 2014-2015

Positioning and complete installation of technological piping sistem.

Holvrieka

Tanzania Breweries

Tanzania 2014

execution 4 bright beer tanks.

DABRIGEON INOX

FRANCE 2014

Fabrication of 3 x 70 m3 and 1 x 30 m3 new tanks for diary.

MACHINEHANDEL LEKKERKERKER BV

RUSSIA

UVA 2014

Installing of diary equipement .

KIESELMANN

CONGO

BUKAVU

HEINEKEN 2014

Positioning and complete installation of technological piping system.

KIESELMANN

FRNCE

MARSILIA

COCA-COLA 2014

Positioning and complete installation of technological piping system.

TETRA PAK

ROMANIA

PLOIESTI

COCA-COLA HBC ROMANIA 2014

Installation of technological piping system pasteurization syrup.

TETRA PAK

ROMANIA

TIMISOARA

COCA-COLA HBC ROMANIA 2013

Positioning and complete installation of technological piping system.

TETRA PAK

ROMANIA

DORNA CANDRENI

COCA-COLA HBC ROMANIA 2013

Positioning and complete installation of technological piping system.

RARAUL S.A.

ROMANIA

CAMPULUNG 2013

Modified piping lines.

Insulation and metal works.

HOLVRIEKA IDO BV

CONGO

BRAZZAVILLE

HEINEKEN 2013

Site fabrication and installation of 5 fermenting storage tanks 1.500 hl

KIESELMANN

FRANCE

ANTARTIC SAS 2013

Positioning and complete installation of technological piping system.

KIESELMANN

GERMANY

PASSAU

BRAUEREI HACKLBERG 2013

Positioning and complete installation of technological piping system.

HOLVRIEKA

HOLLAND

LOUIS DREYFUS 2013

Site fabrication of 6 new ship tanks 12.000 mm Dim under DNV approval.

KIESELMANN

PAPUA NEW GUINEA

SP BREWERY 2013

Tank farm installation.

KIESELMANN

SWEDEN

SPENDRUPS BRYGGERI 2013

Extension of BBT cellar.

RIEGER BEHALTERBAU

GERMANY 2012

Execution of 9 tanks.

C.S.I.

ROMANIA

CLUJ NAPOCA 2012

Welding, mechanical assembly line palletizing and conveyors.

HOLVRIEKA NV

BELGIUM 2012

Fabrication of piping , etc on tanks.

RIEGER BEHALTERBAU

GERMANY 2012

Executions of 6 tanks

Executions of 9 tanks

KIESELMANN

FINNLAND

OLVI PLC 2012

Positioning and complete installation of technological piping system.

HOLVRIEKA

CROATIA

KARLOVAC

KARLOVACKA PIVOVARIA 2012

Executions and installing for 2 new fermenting tanks 1.500 hl

HOLVRIEKA NIROTA

HOLLAND

ROTERDAM 2011

Executions and installing for 4 new storage tanks 2.500 m3

HOLVRIEKA IDO

REPUBLIQUE DU CONGO

KINSANGANI

HEINEKEN 2011

Executions and installation for 5 new fermenting storage tanks 1.600 hl .

KIESELMANN

AUSTRIA

PFANNER HERMANN GETRANKE 2011

Positioning and complete installation of technological piping system.

KIESELMANN

SWEDEN

SPENDRUPS BRYGGERI 2011

Positioning and complete installation of technological piping system.

Electric installation and assistance of commissioning of the automation system.

KIESELMANN

GERMANY

HERZOGLICH BAYERISCHES BAUHAUS

TEGERNSEE 2011

Positioning and complete installation of technological piping system.

KIESELMANN

FRANCE

CIE FRANCAISE DES GRAND VINS 2011

Positioning and complete installation of technological piping system.

KIESELMANN

HONG KONG

Positioning and complete installation of technological piping system.

KIESELMANN

GHANA

GUINNESS 2011

Positioning and complete installation of technological piping system.

KIESELMANN

KRONES

BRAZIL

BELEM 2011

Positioning and complete installation of technological piping system.

HOLVRIEKA IDO

SPAIN

VALENCIA

HEINEKEN 2011

Assistance during installation on site

Installation of legs

Installations of tanks and assembly of walk ways of 9 + 5 new fermenting storage tanks 4.800 hl.

SOPURA

ROMANIA

HEINEKEN

MIERCUREA CIUC 2011

Piping installations.

EDELSTAHL ANLAGENBAU

GERMANY 2010

Positioning and complete installation of technological piping system.

HOLVRIEKA B.V.

BELGIUM 2010

Fabrication of piping , etc on tanks.

HOLVRIEKA NIROTA

HOLLAND

ROTHERDAM 2010

Ste fabrication and installation of 7 new storage tanks 3.000 m3

HOLVRIEKA IDO

ROMANIA

ROMAQUA BREWEY 2010

Site fabrication and installation of 4 new BBT 4.200 dim and 1 ZKT 5.400 dim

KIESELMAN

ANGOLA

COCA-COLA 2010

Positioning and complete installation of technological piping system.

HEINEKEN

ROMANIA

TG. MURES 2010

Positioning and installation of CO2 piping system.

KIESELMANN

AUSTRIA

MURAU 2010

Positioning and complete installation of technological piping system.

HEINEKEN

ROMANIA

MIERCUREA CIUC 2009

Modified yeast tanks.

ZIEMANN

CROATIA

BRODOSPLIT SHIPYARD 2009

Execution and installation of ship tanks.

ZIEMANN

ITALY

ALGUND

BIRRA FORST 2009-2010

Turn key complete brewhouse

Electric installation and assistance of commissioning of the automation system.

RULAND

NIGERIA

NESTLE 2009

– Positioning and complete installation of technological piping system.

ZIEMANN

AUSTRIA

ST.POLTEN

PRIVATBRUEREI FRITZ EGGER 2009

– Fitting of equipment the connection piping in the filling line, including the delivery tube and fittings and two operating platforms.

HOLVRIEKA

HOLVRIEKA IDO B.V.

SPANIA

ZUMOS VALENCIANOS DEL MEDITERRANEO

– Executions and installation for 80 storage tanks 500 cubic meter.

E&F nord

BULGARIA

KOSTIMBROD, HASKOVO

Coca – Cola

– Positioning and complete installation of technological piping system.

E&F Nord

BRAZIL

NESTLE

– Positioning and complete installation of technological piping system.

E&F Nord

SAB MILLER-URSUS BREWERIES

Timisoara 2009

– Positioning and complete installation of technological piping system.

ZIEMMAN

SAB MILLER-URSUS BREWERIES

BUZAU 2008

– Positioning 24 tanks

HEINEKEN

Miercurea Ciuc Brewery 2008

– Positioning and complete installation of technological piping system.

HOLVRIEKA

HOLVRIEKA IDO B.V.

CONGO – Brazzaville

2008

– Fabrication and installation 4 fermenting / storage tank 1375 hl.

E&F nord

Kenia 2008

– Executions, positioning and complete piping installation

COCA-COLA

Coca-Cola HBC Romania SRL

Ploiesti 2008

– Positioning and complete installation of new pipe bridge and technological piping system for bottling line

HOLVRIEKA

HOLVRIEKA IDO B.V.

GET BELGIUM 2008

– Site fabrication and installation of 6 new storage tanks 50.000 hl, for juice

GUINNESS LTD

BENIN BREWERY

BENIN City NIGERIA 2008

– Positioning and complete installation of technological piping system for new bottling line

HEINEKEN

NIGERIAN BREWERIES LTD

ABA NigeRia 2008

– Positioning and complete installation of technological piping system for new glycol line

HOLVRIEKA

HOLVRIEKA NIROTA B.V.

SNEEK HOLAND 2008

-Executions tanks,

HEINEKEN

Malbera brewary

CONSTANTA 2008

– Positioning and complete installation of technological piping system

– 4 cylindroconical tanks and 2 BBT

HEINEKEN

Miercurea Ciuc Brewery 2008

Executions, positioning and complete instalation for:

4 BBT tanks,

HEINEKEN

CRAIOVA brewary 2008

– Positioning and complete installation of technological piping system for

– 10 cylindroconical tanks and 4 BBT

– CIP station

– new filtration station with membrane filter

– new pipe bridges

– new water treatment station

– new yeast propagation and storage cellar

KRONES

ROMAQUA SEBES 2007 – 2008

Positioning and complete installation of technological piping system for

– cylindroconical tanks and BBT

– CIP station

– filtration station

– pipe bridges

– water treatment station

– yeast propagation and storage cellar

ZIEMANN

ROMAQUA SEBES 2007 – 2008

Executions and positioning for:

Fermentation tanks, capacity 3790 HL – 15 pcs

HOLVRIEKA

ALBRAU S.A., Onesti 2007

Executions and positioning for :

BBT’s tanks , capacity: 1250HL – 4 pcs

BBT,’ tanks, capacity: 2250 HL – 4 pcs

HOLVRIEKA

Heineken Zargorka Brewery

Bulgaria 2007 – 2008

Executions and positioning for:

Fermentation tanks, capacity 5000 HL – 6 pcs

HEINEKEN

Miercurea Ciuc Brewery 2007

Executions, positioning and complete instalation for:

C.I.P.’s tanks, capacity: 146 hl – 5 pcs

Intermediary tank, capacity: 600 hl – 1 pcs

HOLVRIEKA

European Drinks 2007

Executions and positioning for:

BBT’s tanks, capacity: 2490 HL – 8 pcs

T.N.U.V.A.,

Bucharest Diary 2007

– Complete installation of a new Diary.

HEINEKEN

Malbera brewary CONSTANTA

2007

– Positioning and complete installation of technological piping system

– 10 cylindroconical tanks and 4 BBT

– CIP station

– filtration station

– pipe bridges

– water treatment station

– water house

HEINEKEN

BERE CIUC SA, M. Ciuc

– Complete installation of technological piping

TERAPIA S.A.

Pharmaceutical Factory Cluj-Napoca

– Complete installation of technological piping

TUBORG,

Bucuresti

– Washer tank 15 m3

DORNA LACTATE, Diary Vatra Dornei

– Tanks for milk reception 30 and 50 m3

FARMEC S.A.

Cluj-Napoca

– Tanks for stocking cream.

HTI

Italia

– Tubular heat exchanger for pharmaceutical factory, 15 pcs.

ANTIBIOTICE IASI S.A.

Pharmaceutical Factory Iasi

– Complete installation of technological piping for PW.

SIGAT, Bucuresti

PEPSI

– Complete installation of technological piping

LACTAG,

Giurgiu Diary

– Complete design and installation of a CIP station

INTERAGRO,

Zimnicia Diary

– Complete design and installation of a CIP station

S.C. EUROPEAN DRINKS S.A

Bihor.

– Complete installation of Water tanks and BBT tanks(HOLVRIEKA)

S.C. KANDIA-EXCELLENT S.A.

Bucuresti

– Complete installation of technological piping for chocolate

FRIESLAND

Napolact Diary

Cluj-Napoca

– Complete installation of reception station for milk.

– Complete installation of a CIP station

FRIESLAND

Satu Mare Diary

– Design and execution of 200 pcs. of a cheese carriage.

FARMEC S.A.

Cluj-Napoca

– Tank for cream, capacity 1 m3 .

FRIESLAND

Carei Diary

– Complete design and installation of a CIP station

S.C. KANDIA-EXCELLENT S.A.

Bucuresti

– Tank for chocolate, capacity – 3 mc.

– Tank for chocolate, capacity – 10 mc.

RARAUL,

Campu Lung Moldovenesc Diary

– Complete design and installation of a CIP station

HEINEKEN S.A.

APATIM BREWERY, Serbia

– Complete installation of technological piping.

KARLSBERG, Germany

– Complete installation of technological piping.

WILD

Germany

– Complete installation of technological piping for syrup

BIOFARM SA

Pharmaceutical Factory, Bucuresti

– Complete installation of technological piping PW, CS. (Gea)

S.C. EUROPEAN DRINKS S.A Bihor.

– Complete installation of technological piping.

S.C. EXCELENT S.A.

Bucuresti

– Mobile Tank for chocolate.

BELIZE AQUACULTURE Ltd,

Belize, Central America

– Complete installation of processing shrimps plant (York + ATM+ SIEMENS)

Baileys, North Ireland

– Complete installation of new technological system (GEA + ATM)

LADYVILLE BREWERY,

Belize, Central America

– Complete installation of technological piping system (Steinecker + ATM):

– extension

S.C. EUROPEAN FOOD S.A.

Bihor.

– Positioning and complete installation of 2 mio Hl. New Brewery Plant. – Steinecker

S.C. EXCELENT S.A.

Bucharest.

– Tanks for chocolate – 500 l.

NEUHOLD GmbH, Austria

– Different stainless steel parts and devices for water treatment plant

UNILEVER

Margarine Plant, Targu Mures

– Complete piping and installation of new margarine plant(GEA)

HEINEKEN

ARBEMA, Arad

– Tanks for cold water, hot water:

40 m3 – 2 pcs.

– Tank BBT 80 m3 for non-alcoholic beer

– Complete piping and installation of new equipment for non-alcoholic beer

INTERBREW EFES BREWERY, Ploiesti

– Complete installation of centrifuge – GEA TUCHENHAGEN

INTERBREW

Beck&Co Brewery, Bremen

GERMANY

– Positioning and complete installation of New Filtration Plant (Filtrox + ATM + Siemens)

CERVECERIA NACIONAL DOMINICANA,

Republica Dominicana, Santo Domingo

– Positioning and complete installation of technological piping system (Steinecker + ATM):

– pipe bridges

– bottling and KEG lines

– cooling station – amoniac and glycol

– water treatment station

– water house

HEINEKEN

CIUC BREWERY , M. Ciuc

– Execution, positioning and complete installation

– cylindroconical tank borhot, Ø 4.000 x H 22.000 mm.,

volume 160 m3

INTERBREW EFES BREWERY, Ploiesti

– Complete piping system at canning line 35.000 cans/h.

LADYVILLE BREWERY,

Belize, Central America

– Positioning and complete installation of technological piping system (Steinecker + ATM):

– pipe bridges

– bottling and KEG lines

– cooling station – amoniac and glycol

– water treatment station

– water house

HALC SA, Miercurea Ciuc

– Complete system of 24 storage tanks for alchoolic drinks

S.A.B. MILLER

SC AURORA BREWERY SA, Brasov

– Execute and mounting:

– Cold an hot water tank, 100 and 200 m3

– Tank for solution 5 m3

NEUHOLD GmbH, Austria

– Different stainless steel parts and devices for water treatment

SC ROBEMA SA,

Rosiorii de Vede

– Complete mounting of a flash Pasteur.

DORNA LACTATE, Vatra Dornei Diary

– Complete technological piping system for different food liquids and utilities.

HEINEKEN

HABER INTERNATIONAL BREWERY SA, Hateg

– Tanks:

– warm water 150 m3 – 1 pcs.

– cold water 80 m3 – 1 pcs.

– last water 6,2 m3 – 1 pcs.

– CIP tank 6 m3 – 4 pcs.

– trub tank 3,5 m3 – 1 pcs.

– Cooling plates for fermenting tanks – 80 pcs.

– Brewhouse extension.

HEINEKEN

GRIVITA INTERNATIONAL BREWERY SA, Bucharest.

– Tanks:

– warm water 150 m3 – 1 pcs.

– cold water 80 m3 – 1 pcs.

– last water 6,2 m3 – 1 pcs.

– Boiling house extension

– CIP tank 7 m3 – 3 pcs.

ALUTUS BREWERY SA,

Rm. Valcea

– Positioning and complete installation of technological piping system(Leushuis):

– cylindroconical tanks Holvrieka (4 pcs)

– pipe bridges

– brewhouse extension

– Tank for used water 10 m3

INTERBREW

PROBERCO BREWERY SA, Baia-Mare

– Positioning and complete installation of technological piping system.:

– cylindroconical tanks (6 pcs.)

– cooling station: amoniac + glycol

– high gravity system

– pipe bridges

– brewhouse extension

– Deaeration water tank 20 m3 for high gravity system

EFES PILSNER – COZLA SRL

– Complete installation of technological piping system.

HEINEKEN

SILVA BREWERY SA, Reghin

– Complete installations for KEG line

– Complete installations for flash pasteurizer.

– Sterilisation tanks for different pipes.

S.A.B. MILLER

URSUS BREWERY SA, Pitesti

– Cylindroconical tank for maltose 450 hl

– Complete maltose technological installation: engineering, execution and automation.

S.A.B. MILLER

URSUS BREWERY SA, Buzau

– Positioning and complete installation of fermenting and boiling houses

– Cooling plates for fermenting tanks – 108 pcs.

– Installations for fermenting extension.

HEINEKEN

CIUC BREWERY SA, M. Ciuc

– Positioning and complete installation of technological piping system.(Steinecker + Kieselmann):

– cylindroconical tanks and BBT (24 + 6 pcs.)

– yeast station, CIP station, filtration station

– pipe bridges

– water treatment station.

– Execution of tanks for cold water, hot water, beer:

140 m3 – 2 pcs.

75 m3 – 2 pcs.

80 m3 – 1 pcs.

– Stainless steel platforms.

– Execution of Bright Beer tanks BBT : 100 m3 – 8 pcs

INTERBREW

EFES BREWERY,

Ploiesti

– Positioning and complete installation of technological piping system (Steinecker + ATM):

– pipe bridges

– bottling and KEG lines

– cooling station – amoniac and glycol

– water treatment station

– water house

S.A.B. MILLER

URSUS BREWERY SA, Cluj

– Positioning and complete installation of fermenting and boiling houses and technological piping system (Holvrieca + Kieselmann):

– Cylindroconical tank for maltose 750 hl

– Complete maltose technological installation: engineering, execution and automation.

– Cooling station – amoniac and glycol

– Stainless steel platforms.

– Sterilisation tanks for different pipes.

TUBORG BREWERY

Bucharest

– Positioning and complete installation of technological piping system (Steinecker + Sudmo):

– cylindroconical tanks and BBT (16 + 6 pcs)

– yeast cellar

– CIP station

– filtration station

– compressed air station

– heating station

– pipe bridges

– bottling and KEG lines

– water treatment station

– water house

B. Bottling lines equipment.

ImageLogitech Exif JPEGScreen Shot 2014-10-03 at 13.39.30trans pneumatic7Screen Shot 2014-10-03 at 13.39.54100_2087

Company Project
SUN INBEVRUSSIA

KLIN 2013

Works on installation and commissioning of a new programme for a new bottle at line 12 Klin .
FRIESLANDROMANIA

SATU MARE 2012

Cheese carriage 200 pcs.
C.B.I.UK 2010 Modification to double deck tunnel pasteurizer for 25.000 BPH 75 cl 50 PU
EUROCONSERVZALAU

ROMANIA 2008

Complete conveyor system for vegetables
SAB MILLERTIMISOARA

ROMANIA BREWERY 2008

Crate washer
FARMECCLUJ

ROMANIA 2008

Conveyors for dose
INTERBREWBORSODI

HUNGARIA BREWERY 2007 – 2008

Installing PET conveyors from Packing
INBEV HEADQUARTERSLEUVEN

BELGIUM 2008

Warmer 46.800 bottles/hour
COCA-COLAHBCORIOL

RUSIA 2007

— Complete air conveyors for P.E.T. bottle for 3 type PET
ALBRAUONESTI

ROMANIA 2008

– Complete system of bottle conveyors
INTERBREWBLAJ

ROMANIA BREWERY 2007 – 2008

Crate conveyorsPallets conveyors
INTERBREWJSC KLIN BREWERY,

RUSIA

– Double-deck Tunnel pasteurizer 60.000 cans/h and 40.000 bottles/h
FRIESLAND NAPOLACT Diary ,Cluj-Napoca – Conveyors system for milk pack
HEINEKENCraiova Brewery – Complete system conveyors for P.E.T. bottle.- Complete air conveyors for P.E.T. bottle
S.C. SCANDIA ROMANA S.A., Sibiu, Romania, – Complete system of can conveyors
S.C. AGRICOVER S.A., Buzau, Romania – Complete system conveyors for P.E.T. bottle
ELISON INTERTRADE LLCLas Vegas, USA – Complete Air conveyors system for P.E.T. bottle
CHALON-MEGARDFranta – Cheese Tunnel
S.A.B. MILLERCOMPANIA DE BERE ROMANIA, Fabrica Ursus, Cluj-Napoca – Tubular heat exchanger
S.C. COCA-COLA HBC,Oradea – Complet overhaul of bottles conveyors
CHALON-MEGARDFranta – Cheese Tunnel
BACARDI-MARTINI,UK – Double-deck Tunnel pasteurizer, 50.000 bph
INTERBREW BREWERY Borsodi, Ungaria, – Complete mounting of one Bottle line
FRIESLANDSatu Mare Diary, – Cheese Press system
KONIGS-TRUDO,ZonhovenBelgia – Complete mounting of three Bottle line
S.C. COCA-COLA HBC,Oradea – Complete system of bottle conveyors- 3 pcs. Pressure less In liners 35.000 bot/h full automatized with PLC and frequency inverters Siemens(Hard + soft).
FRIESLAND NAPOLACT Diary , Cluj-Napoca – Crate Washer with a capacity of 600 cph.
HEINEKENHateg Brewery – Depaletizer Kettner, completely overhauled- Complete system of pallet and crate conveyors
S.C. SCANDIA ROMANA S.A., Sibiu, Romania – Complete system of can conveyors
S.A.B. MILLERCOMPANIA DE BERE ROMANIA, Ursus Brewery, Cluj-Napoca – Complete system of bottle conveyors at bottle inspector Heuft
COCA-COLA HBC, Timisoara – Complete system of PET bottle conveyors.
S. C. INTERBREW EFES BREWERY S.A. , Ploiesti – Complete system of bottle conveyors for bottle inspector KRONES.
S.C. AGRICOVER S.A., Buzau, Romania, – Complete system conveyors for P.E.T. bottle
HMI Michael PreissGermania – Conveyors system with gummy band.
S.C. SCANDIA ROMANA S.A., Sibiu, Romania, – Complete system of can conveyors
INTERBREW COMPANIA DE DISTRIBUTIE NATIONAL, Blaj Bergenbier Brewery, – Complete system of bottle conveyors- 1 pcs. Pressure less In liners 40.000 bot/h full automatized with PLC and frequency inverters Siemens (Hard + soft).
S.A.B. MILLER COMPANIA DE BERE ROMANIA, Ursus Brewery, Cluj-Napoca – Complete system of bottle conveyors at bottle inspector Heuft
HEINEKENCraiova Brewery – Complete system of can conveyors, for sis-pack line.
KONIGS-TRUDO, ZonhovenBelgia – Complete mounting of three Bottle line
TUBORG, Romania – Complete mounting of Bottle line from SIG-SIMONAZI
SC AGRICOVER SA,Buzau – Complete system of PET bottle conveyors.
LINDEMANS BREWERYBelgia – Single-deck Tunnel pasteurizer 24.000 bot/h
INTERBREWJSC ROSAR BREWERY OMSKRUSIA – Double-deck Tunnel pasteurizer 30.000 bot/h (Interbrew)
INTERBREWJSC KLIN BREWERY, RUSIA – Double-deck Tunnel pasteurizer 30.000 bot/h (Interbrew)
TREI STEJARI BREWERY SA, Sibiu – Complete system of air conveyors for PET bottles, complete system of PET bottle conveyors.
HEINEKENMALBERA, Constanta – Bottle conveyors at bottle inspector Heuft
HEINEKENARBEMA BREWERY S.A., Arad – Depaletizer Kettner, completely overhauled- Related pallet and crate conveyors
BRAVO HOLDINGS INTERNATIONAL,Sankt Petersburg – Complete air conveyors system for PET bottles, fully automatized, with PLC, frequency inverters and automatic guiding rails for 2 different types of bottles.
HALC SA, Miercurea Ciuc – Complete system of bottle conveyors- Complete system of crate conveyors
INTERBREW EFES BREWERY SA,Ploiesti – Relocation of Canning Line from Belgium to Interbrew – EFES Ploiesti Romania.
HEINEKENGRIVITA BREWERY SA, Buc., – Complete system of bottle conveyors- Complete system of crate conveyors- optimisation of the Bottle Washer
ALUTUS BREWERY SA, Valcea, – Tunnel Pasteurizer 24.000 b/h
ERBEN Ltd, England – Complete overhaul for filling machine Ortman-Herbst 36.000but/h.
FIDIA, Italia – Elevator system for carton packs.
AAM INTERN. A/S, Denmark – Complete system of bottle carriers for bottle washer
ALBRAU ONESTI BREWERY – Double-deck Tunnel pasteurizer 18.000 boot/h
LERUM A/S, Norvegia – Complete air conveyors system for PET bottles, fully automatized, with PLC, frequency inverters and automatic guiding rails for 8 different types of bottles.
INTERBREWBIANCA INTERBREW SA, Blaj – Complete system of bottle conveyors- 1 pcs. Pressure less In liners 40.000 bot/h full automatized with PLC and frequency inverters Siemens (Hard + soft).- Crate conveyors system
INTERBREWPROBERCO BREWERY SA, Baia-Mare – Complete system of bottle conveyors- 2 pcs. Pressure less In liners 40.000 bot/h full automatized with PLC and frequency inverters Siemens (Hard + soft).- Complete optimisation of Line 1.- New automation with PLC and frequency inverter of Jagenberg labeller.- Overhaul of Born Binder
ARDEALUL SA, Carei – Complete system of bottle conveyors
ARGUS SA, Constanta – Complete system of crate conveyors.
Pepsi – Cola Bottlers Arad SA – Complete system of crate conveyors.
Coca – Cola Bottlers Timis SA – Complete system of PET bottle conveyors.
Coca – Cola Bottlers Bihor SA – Complete system of crate conveyors
Coca – Cola Bottlers Iasi SA – Complete system of air conveyors for PET bottles.
MUNTENIA SA, Bucuresti – Complete system of air conveyors for PET bottles.
OLTCHIM SA, Rm. Valcea – Complete system of bottle conveyors.
HEINEKENSILVA BREWERY SA, Reghin – Complete installation of KEG line.- Complete installation of flash pasteurizer.- Crate washer.
S.A.B. MILLERURSUS BREWERY SA , Pitesti – Complete system of bottle conveyors
S.A.B. MILLERURSUS BREWERY SA , Buzau – Complete system of bottle conveyors.- Complete system of crate conveyors.
HEINEKENCIUC BREWERY SA, M. Ciuc – Crate washer 3.000 crates/h.
S.A.B. MILLERURSUS BREWERY SA, Cluj – Double-deck Tunnel pasteurizer 45.000 bot/h- Complete system of bottle conveyors.- Complete system of crate conveyors.- Complete overhaul for Palletizes and pallet conveyors KETTNER + KHS, including automation with PLC Siemens (Hard + soft).

IMGA0424Image 702-07-07_1626IMG_9316IMG_9332Screen Shot 2014-10-03 at 13.56.39

Continuarea navigarii pe acest site se considera acceptare a politicii de utilizare a cookies si a politicii de prelucrare a datelor personale.