A. Montage and Installations, tanks and technological systems
Company |
Project |
KieselmannCarsberg Dahls BryggeriNorvegia 2016 |
Positioning and complete installation of technological piping sistem,cip station,BBT and CCT cellar. |
KieselmannSpa Monopole SA -Belgia 2015 |
Positioning and complete installation of technological piping sistem,cip station |
Aberle GmbH-MercedesRomania 2015 |
Assembly new line |
HolvriekaOlanda 2015 |
tanks assembly |
EA nord Edelstahl-Analgentechnic u. Montage GmbH- MullerGermania 2015 |
Positioning and complete installation of technological piping sistem |
EA nord Edelstahl-Analgentechnic u. Montage GmbHBrauerei ForstItalia 2015 |
Positioning and complete installation of technological piping sistem. |
KieselmannSpendrups BryggerySuedia 2015 |
Extension of CCT cellar. |
EA nord Edelstahl-Analgentechnic u. Montage GmbHSteinrieser GetrankeAustria 2014-2015 |
Positioning and complete installation of technological piping sistem. |
HolvriekaTanzania BreweriesTanzania 2014 |
execution 4 bright beer tanks. |
DABRIGEON INOXFRANCE 2014 |
Fabrication of 3 x 70 m3 and 1 x 30 m3 new tanks for diary. |
MACHINEHANDEL LEKKERKERKER BVRUSSIAUVA 2014 |
Installing of diary equipement . |
KIESELMANNCONGOBUKAVUHEINEKEN 2014 |
Positioning and complete installation of technological piping system. |
KIESELMANNFRNCEMARSILIACOCA-COLA 2014 |
Positioning and complete installation of technological piping system. |
TETRA PAKROMANIAPLOIESTICOCA-COLA HBC ROMANIA 2014 |
Installation of technological piping system pasteurization syrup. |
TETRA PAKROMANIATIMISOARACOCA-COLA HBC ROMANIA 2013 |
Positioning and complete installation of technological piping system. |
TETRA PAKROMANIADORNA CANDRENICOCA-COLA HBC ROMANIA 2013 |
Positioning and complete installation of technological piping system. |
RARAUL S.A.ROMANIACAMPULUNG 2013 |
Modified piping lines.Insulation and metal works. |
HOLVRIEKA IDO BVCONGOBRAZZAVILLEHEINEKEN 2013 |
Site fabrication and installation of 5 fermenting storage tanks 1.500 hl |
KIESELMANNFRANCEANTARTIC SAS 2013 |
Positioning and complete installation of technological piping system. |
KIESELMANNGERMANYPASSAUBRAUEREI HACKLBERG 2013 |
Positioning and complete installation of technological piping system. |
HOLVRIEKAHOLLANDLOUIS DREYFUS 2013 |
Site fabrication of 6 new ship tanks 12.000 mm Dim under DNV approval. |
KIESELMANNPAPUA NEW GUINEASP BREWERY 2013 |
Tank farm installation. |
KIESELMANNSWEDENSPENDRUPS BRYGGERI 2013 |
Extension of BBT cellar. |
RIEGER BEHALTERBAUGERMANY 2012 |
Execution of 9 tanks. |
C.S.I.ROMANIACLUJ NAPOCA 2012 |
Welding, mechanical assembly line palletizing and conveyors. |
HOLVRIEKA NVBELGIUM 2012 |
Fabrication of piping , etc on tanks. |
RIEGER BEHALTERBAUGERMANY 2012 |
Executions of 6 tanksExecutions of 9 tanks |
KIESELMANNFINNLANDOLVI PLC 2012 |
Positioning and complete installation of technological piping system. |
HOLVRIEKACROATIAKARLOVACKARLOVACKA PIVOVARIA 2012 |
Executions and installing for 2 new fermenting tanks 1.500 hl |
HOLVRIEKA NIROTAHOLLANDROTERDAM 2011 |
Executions and installing for 4 new storage tanks 2.500 m3 |
HOLVRIEKA IDOREPUBLIQUE DU CONGOKINSANGANIHEINEKEN 2011 |
Executions and installation for 5 new fermenting storage tanks 1.600 hl . |
KIESELMANNAUSTRIAPFANNER HERMANN GETRANKE 2011 |
Positioning and complete installation of technological piping system. |
KIESELMANNSWEDENSPENDRUPS BRYGGERI 2011 |
Positioning and complete installation of technological piping system.Electric installation and assistance of commissioning of the automation system. |
KIESELMANNGERMANYHERZOGLICH BAYERISCHES BAUHAUSTEGERNSEE 2011 |
Positioning and complete installation of technological piping system. |
KIESELMANNFRANCECIE FRANCAISE DES GRAND VINS 2011 |
Positioning and complete installation of technological piping system. |
KIESELMANNHONG KONG |
Positioning and complete installation of technological piping system. |
KIESELMANNGHANAGUINNESS 2011 |
Positioning and complete installation of technological piping system. |
KIESELMANNKRONESBRAZILBELEM 2011 |
Positioning and complete installation of technological piping system. |
HOLVRIEKA IDOSPAINVALENCIAHEINEKEN 2011 |
Assistance during installation on siteInstallation of legsInstallations of tanks and assembly of walk ways of 9 + 5 new fermenting storage tanks 4.800 hl. |
SOPURAROMANIAHEINEKENMIERCUREA CIUC 2011 |
Piping installations. |
EDELSTAHL ANLAGENBAUGERMANY 2010 |
Positioning and complete installation of technological piping system. |
HOLVRIEKA B.V.BELGIUM 2010 |
Fabrication of piping , etc on tanks. |
HOLVRIEKA NIROTAHOLLANDROTHERDAM 2010 |
Ste fabrication and installation of 7 new storage tanks 3.000 m3 |
HOLVRIEKA IDOROMANIAROMAQUA BREWEY 2010 |
Site fabrication and installation of 4 new BBT 4.200 dim and 1 ZKT 5.400 dim |
KIESELMANANGOLACOCA-COLA 2010 |
Positioning and complete installation of technological piping system. |
HEINEKENROMANIATG. MURES 2010 |
Positioning and installation of CO2 piping system. |
KIESELMANNAUSTRIAMURAU 2010 |
Positioning and complete installation of technological piping system. |
HEINEKENROMANIAMIERCUREA CIUC 2009 |
Modified yeast tanks. |
ZIEMANNCROATIABRODOSPLIT SHIPYARD 2009 |
Execution and installation of ship tanks. |
ZIEMANNITALYALGUNDBIRRA FORST 2009-2010 |
Turn key complete brewhouseElectric installation and assistance of commissioning of the automation system. |
RULANDNIGERIANESTLE 2009 |
– Positioning and complete installation of technological piping system. |
ZIEMANNAUSTRIAST.POLTENPRIVATBRUEREI FRITZ EGGER 2009 |
– Fitting of equipment the connection piping in the filling line, including the delivery tube and fittings and two operating platforms. |
HOLVRIEKAHOLVRIEKA IDO B.V.SPANIAZUMOS VALENCIANOS DEL MEDITERRANEO |
– Executions and installation for 80 storage tanks 500 cubic meter. |
E&F nordBULGARIAKOSTIMBROD, HASKOVOCoca – Cola |
– Positioning and complete installation of technological piping system. |
E&F NordBRAZILNESTLE |
– Positioning and complete installation of technological piping system. |
E&F NordSAB MILLER-URSUS BREWERIESTimisoara 2009 |
– Positioning and complete installation of technological piping system. |
ZIEMMANSAB MILLER-URSUS BREWERIESBUZAU 2008 |
– Positioning 24 tanks |
HEINEKENMiercurea Ciuc Brewery 2008 |
– Positioning and complete installation of technological piping system. |
HOLVRIEKAHOLVRIEKA IDO B.V.CONGO – Brazzaville2008 |
– Fabrication and installation 4 fermenting / storage tank 1375 hl. |
E&F nordKenia 2008 |
– Executions, positioning and complete piping installation |
COCA-COLACoca-Cola HBC Romania SRLPloiesti 2008 |
– Positioning and complete installation of new pipe bridge and technological piping system for bottling line |
HOLVRIEKAHOLVRIEKA IDO B.V.GET BELGIUM 2008 |
– Site fabrication and installation of 6 new storage tanks 50.000 hl, for juice |
GUINNESS LTDBENIN BREWERYBENIN City NIGERIA 2008 |
– Positioning and complete installation of technological piping system for new bottling line |
HEINEKENNIGERIAN BREWERIES LTDABA NigeRia 2008 |
– Positioning and complete installation of technological piping system for new glycol line |
HOLVRIEKAHOLVRIEKA NIROTA B.V.SNEEK HOLAND 2008 |
-Executions tanks, |
HEINEKENMalbera brewaryCONSTANTA 2008 |
– Positioning and complete installation of technological piping system– 4 cylindroconical tanks and 2 BBT |
HEINEKENMiercurea Ciuc Brewery 2008 |
Executions, positioning and complete instalation for:4 BBT tanks, |
HEINEKENCRAIOVA brewary 2008 |
– Positioning and complete installation of technological piping system for– 10 cylindroconical tanks and 4 BBT– CIP station– new filtration station with membrane filter– new pipe bridges– new water treatment station– new yeast propagation and storage cellar |
KRONESROMAQUA SEBES 2007 – 2008 |
Positioning and complete installation of technological piping system for– cylindroconical tanks and BBT– CIP station– filtration station– pipe bridges– water treatment station– yeast propagation and storage cellar |
ZIEMANNROMAQUA SEBES 2007 – 2008 |
Executions and positioning for:Fermentation tanks, capacity 3790 HL – 15 pcs |
HOLVRIEKAALBRAU S.A., Onesti 2007 |
Executions and positioning for :BBT’s tanks , capacity: 1250HL – 4 pcsBBT,’ tanks, capacity: 2250 HL – 4 pcs |
HOLVRIEKAHeineken Zargorka BreweryBulgaria 2007 – 2008 |
Executions and positioning for:Fermentation tanks, capacity 5000 HL – 6 pcs |
HEINEKENMiercurea Ciuc Brewery 2007 |
Executions, positioning and complete instalation for:C.I.P.’s tanks, capacity: 146 hl – 5 pcsIntermediary tank, capacity: 600 hl – 1 pcs |
HOLVRIEKAEuropean Drinks 2007 |
Executions and positioning for:BBT’s tanks, capacity: 2490 HL – 8 pcs |
T.N.U.V.A.,Bucharest Diary 2007 |
– Complete installation of a new Diary. |
HEINEKENMalbera brewary CONSTANTA2007 |
– Positioning and complete installation of technological piping system– 10 cylindroconical tanks and 4 BBT– CIP station– filtration station– pipe bridges– water treatment station– water house |
HEINEKENBERE CIUC SA, M. Ciuc |
– Complete installation of technological piping |
TERAPIA S.A.Pharmaceutical Factory Cluj-Napoca |
– Complete installation of technological piping |
TUBORG,Bucuresti |
– Washer tank 15 m3 |
DORNA LACTATE, Diary Vatra Dornei |
– Tanks for milk reception 30 and 50 m3 |
FARMEC S.A.Cluj-Napoca |
– Tanks for stocking cream. |
HTIItalia |
– Tubular heat exchanger for pharmaceutical factory, 15 pcs. |
ANTIBIOTICE IASI S.A.Pharmaceutical Factory Iasi |
– Complete installation of technological piping for PW. |
SIGAT, BucurestiPEPSI |
– Complete installation of technological piping |
LACTAG,Giurgiu Diary |
– Complete design and installation of a CIP station |
INTERAGRO,Zimnicia Diary |
– Complete design and installation of a CIP station |
S.C. EUROPEAN DRINKS S.ABihor. |
– Complete installation of Water tanks and BBT tanks(HOLVRIEKA) |
S.C. KANDIA-EXCELLENT S.A.Bucuresti |
– Complete installation of technological piping for chocolate |
FRIESLANDNapolact DiaryCluj-Napoca |
– Complete installation of reception station for milk.– Complete installation of a CIP station |
FRIESLANDSatu Mare Diary |
– Design and execution of 200 pcs. of a cheese carriage. |
FARMEC S.A.Cluj-Napoca |
– Tank for cream, capacity 1 m3 . |
FRIESLANDCarei Diary |
– Complete design and installation of a CIP station |
S.C. KANDIA-EXCELLENT S.A.Bucuresti |
– Tank for chocolate, capacity – 3 mc.– Tank for chocolate, capacity – 10 mc. |
RARAUL,Campu Lung Moldovenesc Diary |
– Complete design and installation of a CIP station |
HEINEKEN S.A.APATIM BREWERY, Serbia |
– Complete installation of technological piping. |
KARLSBERG, Germany |
– Complete installation of technological piping. |
WILDGermany |
– Complete installation of technological piping for syrup |
BIOFARM SAPharmaceutical Factory, Bucuresti |
– Complete installation of technological piping PW, CS. (Gea) |
S.C. EUROPEAN DRINKS S.A Bihor. |
– Complete installation of technological piping. |
S.C. EXCELENT S.A.Bucuresti |
– Mobile Tank for chocolate. |
BELIZE AQUACULTURE Ltd,Belize, Central America |
– Complete installation of processing shrimps plant (York + ATM+ SIEMENS) |
Baileys, North Ireland |
– Complete installation of new technological system (GEA + ATM) |
LADYVILLE BREWERY,Belize, Central America |
– Complete installation of technological piping system (Steinecker + ATM):– extension |
S.C. EUROPEAN FOOD S.A.Bihor. |
– Positioning and complete installation of 2 mio Hl. New Brewery Plant. – Steinecker |
S.C. EXCELENT S.A.Bucharest. |
– Tanks for chocolate – 500 l. |
NEUHOLD GmbH, Austria |
– Different stainless steel parts and devices for water treatment plant |
UNILEVERMargarine Plant, Targu Mures |
– Complete piping and installation of new margarine plant(GEA) |
HEINEKENARBEMA, Arad |
– Tanks for cold water, hot water:40 m3 – 2 pcs.– Tank BBT 80 m3 for non-alcoholic beer– Complete piping and installation of new equipment for non-alcoholic beer |
INTERBREW EFES BREWERY, Ploiesti |
– Complete installation of centrifuge – GEA TUCHENHAGEN |
INTERBREWBeck&Co Brewery, BremenGERMANY |
– Positioning and complete installation of New Filtration Plant (Filtrox + ATM + Siemens) |
CERVECERIA NACIONAL DOMINICANA,Republica Dominicana, Santo Domingo |
– Positioning and complete installation of technological piping system (Steinecker + ATM):– pipe bridges– bottling and KEG lines– cooling station – amoniac and glycol– water treatment station– water house |
HEINEKENCIUC BREWERY , M. Ciuc |
– Execution, positioning and complete installation– cylindroconical tank borhot, Ø 4.000 x H 22.000 mm.,volume 160 m3 |
INTERBREW EFES BREWERY, Ploiesti |
– Complete piping system at canning line 35.000 cans/h. |
LADYVILLE BREWERY,Belize, Central America |
– Positioning and complete installation of technological piping system (Steinecker + ATM):– pipe bridges– bottling and KEG lines– cooling station – amoniac and glycol– water treatment station– water house |
HALC SA, Miercurea Ciuc |
– Complete system of 24 storage tanks for alchoolic drinks |
S.A.B. MILLERSC AURORA BREWERY SA, Brasov |
– Execute and mounting:– Cold an hot water tank, 100 and 200 m3– Tank for solution 5 m3 |
NEUHOLD GmbH, Austria |
– Different stainless steel parts and devices for water treatment |
SC ROBEMA SA,Rosiorii de Vede |
– Complete mounting of a flash Pasteur. |
DORNA LACTATE, Vatra Dornei Diary |
– Complete technological piping system for different food liquids and utilities. |
HEINEKENHABER INTERNATIONAL BREWERY SA, Hateg |
– Tanks:– warm water 150 m3 – 1 pcs.– cold water 80 m3 – 1 pcs.– last water 6,2 m3 – 1 pcs.– CIP tank 6 m3 – 4 pcs.– trub tank 3,5 m3 – 1 pcs.– Cooling plates for fermenting tanks – 80 pcs.– Brewhouse extension. |
HEINEKENGRIVITA INTERNATIONAL BREWERY SA, Bucharest. |
– Tanks:– warm water 150 m3 – 1 pcs.– cold water 80 m3 – 1 pcs.– last water 6,2 m3 – 1 pcs.– Boiling house extension– CIP tank 7 m3 – 3 pcs. |
ALUTUS BREWERY SA,Rm. Valcea |
– Positioning and complete installation of technological piping system(Leushuis):– cylindroconical tanks Holvrieka (4 pcs)– pipe bridges– brewhouse extension– Tank for used water 10 m3 |
INTERBREWPROBERCO BREWERY SA, Baia-Mare |
– Positioning and complete installation of technological piping system.:– cylindroconical tanks (6 pcs.)– cooling station: amoniac + glycol– high gravity system– pipe bridges– brewhouse extension– Deaeration water tank 20 m3 for high gravity system |
EFES PILSNER – COZLA SRL |
– Complete installation of technological piping system. |
HEINEKENSILVA BREWERY SA, Reghin |
– Complete installations for KEG line– Complete installations for flash pasteurizer.– Sterilisation tanks for different pipes. |
S.A.B. MILLERURSUS BREWERY SA, Pitesti |
– Cylindroconical tank for maltose 450 hl– Complete maltose technological installation: engineering, execution and automation. |
S.A.B. MILLERURSUS BREWERY SA, Buzau |
– Positioning and complete installation of fermenting and boiling houses– Cooling plates for fermenting tanks – 108 pcs.– Installations for fermenting extension. |
HEINEKENCIUC BREWERY SA, M. Ciuc |
– Positioning and complete installation of technological piping system.(Steinecker + Kieselmann):– cylindroconical tanks and BBT (24 + 6 pcs.)– yeast station, CIP station, filtration station– pipe bridges– water treatment station.– Execution of tanks for cold water, hot water, beer:140 m3 – 2 pcs.75 m3 – 2 pcs.80 m3 – 1 pcs.– Stainless steel platforms.– Execution of Bright Beer tanks BBT : 100 m3 – 8 pcs |
INTERBREWEFES BREWERY,Ploiesti |
– Positioning and complete installation of technological piping system (Steinecker + ATM):– pipe bridges– bottling and KEG lines– cooling station – amoniac and glycol– water treatment station– water house |
S.A.B. MILLERURSUS BREWERY SA, Cluj |
– Positioning and complete installation of fermenting and boiling houses and technological piping system (Holvrieca + Kieselmann):– Cylindroconical tank for maltose 750 hl– Complete maltose technological installation: engineering, execution and automation.– Cooling station – amoniac and glycol– Stainless steel platforms.– Sterilisation tanks for different pipes. |
TUBORG BREWERYBucharest |
– Positioning and complete installation of technological piping system (Steinecker + Sudmo):– cylindroconical tanks and BBT (16 + 6 pcs)– yeast cellar– CIP station– filtration station– compressed air station– heating station– pipe bridges– bottling and KEG lines– water treatment station– water house |
B. Bottling lines equipment.