We ontwikkelen, leveren en implementeren wereldwijde oplossingen met een hoog kwaliteitsniveau voor de drankenindustrie, zodat we samen met onze klanten een langetermijnpartnerschap ontwikkelen om hun groei te ondersteunen..
A. Montage and Installations, tanks and technological systems
Company |
Project |
KieselmannCarsberg Dahls BryggeriNorvegia 2016 |
Positioning and complete installation of technological piping sistem,cip station,BBT and CCT cellar. |
KieselmannSpa Monopole SA -Belgia 2015 |
Positioning and complete installation of technological piping sistem,cip station |
Aberle GmbH-MercedesRomania 2015 |
Assembly new line |
HolvriekaOlanda 2015 |
tanks assembly |
EA nord Edelstahl-Analgentechnic u. Montage GmbH- MullerGermania 2015 |
Positioning and complete installation of technological piping sistem |
EA nord Edelstahl-Analgentechnic u. Montage GmbHBrauerei ForstItalia 2015 |
Positioning and complete installation of technological piping sistem. |
KieselmannSpendrups BryggerySuedia 2015 |
Extension of CCT cellar. |
EA nord Edelstahl-Analgentechnic u. Montage GmbHSteinrieser GetrankeAustria 2014-2015 |
Positioning and complete installation of technological piping sistem. |
HolvriekaTanzania BreweriesTanzania 2014 |
execution 4 bright beer tanks. |
DABRIGEON INOXFRANCE 2014 |
Fabrication of 3 x 70 m3 and 1 x 30 m3 new tanks for diary. |
MACHINEHANDEL LEKKERKERKER BVRUSSIAUVA 2014 |
Installing of diary equipement . |
KIESELMANNCONGOBUKAVUHEINEKEN 2014 |
Positioning and complete installation of technological piping system. |
KIESELMANNFRNCEMARSILIACOCA-COLA 2014 |
Positioning and complete installation of technological piping system. |
TETRA PAKROMANIAPLOIESTICOCA-COLA HBC ROMANIA 2014 |
Installation of technological piping system pasteurization syrup. |
TETRA PAKROMANIATIMISOARACOCA-COLA HBC ROMANIA 2013 |
Positioning and complete installation of technological piping system. |
TETRA PAKROMANIADORNA CANDRENICOCA-COLA HBC ROMANIA 2013 |
Positioning and complete installation of technological piping system. |
RARAUL S.A.ROMANIACAMPULUNG 2013 |
Modified piping lines.Insulation and metal works. |
HOLVRIEKA IDO BVCONGOBRAZZAVILLEHEINEKEN 2013 |
Site fabrication and installation of 5 fermenting storage tanks 1.500 hl |
KIESELMANNFRANCEANTARTIC SAS 2013 |
Positioning and complete installation of technological piping system. |
KIESELMANNGERMANYPASSAUBRAUEREI HACKLBERG 2013 |
Positioning and complete installation of technological piping system. |
HOLVRIEKAHOLLANDLOUIS DREYFUS 2013 |
Site fabrication of 6 new ship tanks 12.000 mm Dim under DNV approval. |
KIESELMANNPAPUA NEW GUINEASP BREWERY 2013 |
Tank farm installation. |
KIESELMANNSWEDENSPENDRUPS BRYGGERI 2013 |
Extension of BBT cellar. |
RIEGER BEHALTERBAUGERMANY 2012 |
Execution of 9 tanks. |
C.S.I.ROMANIACLUJ NAPOCA 2012 |
Welding, mechanical assembly line palletizing and conveyors. |
HOLVRIEKA NVBELGIUM 2012 |
Fabrication of piping , etc on tanks. |
RIEGER BEHALTERBAUGERMANY 2012 |
Executions of 6 tanksExecutions of 9 tanks |
KIESELMANNFINNLANDOLVI PLC 2012 |
Positioning and complete installation of technological piping system. |
HOLVRIEKACROATIAKARLOVACKARLOVACKA PIVOVARIA 2012 |
Executions and installing for 2 new fermenting tanks 1.500 hl |
HOLVRIEKA NIROTAHOLLANDROTERDAM 2011 |
Executions and installing for 4 new storage tanks 2.500 m3 |
HOLVRIEKA IDOREPUBLIQUE DU CONGOKINSANGANIHEINEKEN 2011 |
Executions and installation for 5 new fermenting storage tanks 1.600 hl . |
KIESELMANNAUSTRIAPFANNER HERMANN GETRANKE 2011 |
Positioning and complete installation of technological piping system. |
KIESELMANNSWEDENSPENDRUPS BRYGGERI 2011 |
Positioning and complete installation of technological piping system.Electric installation and assistance of commissioning of the automation system. |
KIESELMANNGERMANYHERZOGLICH BAYERISCHES BAUHAUSTEGERNSEE 2011 |
Positioning and complete installation of technological piping system. |
KIESELMANNFRANCECIE FRANCAISE DES GRAND VINS 2011 |
Positioning and complete installation of technological piping system. |
KIESELMANNHONG KONG |
Positioning and complete installation of technological piping system. |
KIESELMANNGHANAGUINNESS 2011 |
Positioning and complete installation of technological piping system. |
KIESELMANNKRONESBRAZILBELEM 2011 |
Positioning and complete installation of technological piping system. |
HOLVRIEKA IDOSPAINVALENCIAHEINEKEN 2011 |
Assistance during installation on siteInstallation of legsInstallations of tanks and assembly of walk ways of 9 + 5 new fermenting storage tanks 4.800 hl. |
SOPURAROMANIAHEINEKENMIERCUREA CIUC 2011 |
Piping installations. |
EDELSTAHL ANLAGENBAUGERMANY 2010 |
Positioning and complete installation of technological piping system. |
HOLVRIEKA B.V.BELGIUM 2010 |
Fabrication of piping , etc on tanks. |
HOLVRIEKA NIROTAHOLLANDROTHERDAM 2010 |
Ste fabrication and installation of 7 new storage tanks 3.000 m3 |
HOLVRIEKA IDOROMANIAROMAQUA BREWEY 2010 |
Site fabrication and installation of 4 new BBT 4.200 dim and 1 ZKT 5.400 dim |
KIESELMANANGOLACOCA-COLA 2010 |
Positioning and complete installation of technological piping system. |
HEINEKENROMANIATG. MURES 2010 |
Positioning and installation of CO2 piping system. |
KIESELMANNAUSTRIAMURAU 2010 |
Positioning and complete installation of technological piping system. |
HEINEKENROMANIAMIERCUREA CIUC 2009 |
Modified yeast tanks. |
ZIEMANNCROATIABRODOSPLIT SHIPYARD 2009 |
Execution and installation of ship tanks. |
ZIEMANNITALYALGUNDBIRRA FORST 2009-2010 |
Turn key complete brewhouseElectric installation and assistance of commissioning of the automation system. |
RULANDNIGERIANESTLE 2009 |
– Positioning and complete installation of technological piping system. |
ZIEMANNAUSTRIAST.POLTENPRIVATBRUEREI FRITZ EGGER 2009 |
– Fitting of equipment the connection piping in the filling line, including the delivery tube and fittings and two operating platforms. |
HOLVRIEKAHOLVRIEKA IDO B.V.SPANIAZUMOS VALENCIANOS DEL MEDITERRANEO |
– Executions and installation for 80 storage tanks 500 cubic meter. |
E&F nordBULGARIAKOSTIMBROD, HASKOVOCoca – Cola |
– Positioning and complete installation of technological piping system. |
E&F NordBRAZILNESTLE |
– Positioning and complete installation of technological piping system. |
E&F NordSAB MILLER-URSUS BREWERIESTimisoara 2009 |
– Positioning and complete installation of technological piping system. |
ZIEMMANSAB MILLER-URSUS BREWERIESBUZAU 2008 |
– Positioning 24 tanks |
HEINEKENMiercurea Ciuc Brewery 2008 |
– Positioning and complete installation of technological piping system. |
HOLVRIEKAHOLVRIEKA IDO B.V.CONGO – Brazzaville2008 |
– Fabrication and installation 4 fermenting / storage tank 1375 hl. |
E&F nordKenia 2008 |
– Executions, positioning and complete piping installation |
COCA-COLACoca-Cola HBC Romania SRLPloiesti 2008 |
– Positioning and complete installation of new pipe bridge and technological piping system for bottling line |
HOLVRIEKAHOLVRIEKA IDO B.V.GET BELGIUM 2008 |
– Site fabrication and installation of 6 new storage tanks 50.000 hl, for juice |
GUINNESS LTDBENIN BREWERYBENIN City NIGERIA 2008 |
– Positioning and complete installation of technological piping system for new bottling line |
HEINEKENNIGERIAN BREWERIES LTDABA NigeRia 2008 |
– Positioning and complete installation of technological piping system for new glycol line |
HOLVRIEKAHOLVRIEKA NIROTA B.V.SNEEK HOLAND 2008 |
-Executions tanks, |
HEINEKENMalbera brewaryCONSTANTA 2008 |
– Positioning and complete installation of technological piping system– 4 cylindroconical tanks and 2 BBT |
HEINEKENMiercurea Ciuc Brewery 2008 |
Executions, positioning and complete instalation for:4 BBT tanks, |
HEINEKENCRAIOVA brewary 2008 |
– Positioning and complete installation of technological piping system for– 10 cylindroconical tanks and 4 BBT– CIP station– new filtration station with membrane filter– new pipe bridges– new water treatment station– new yeast propagation and storage cellar |
KRONESROMAQUA SEBES 2007 – 2008 |
Positioning and complete installation of technological piping system for– cylindroconical tanks and BBT– CIP station– filtration station– pipe bridges– water treatment station– yeast propagation and storage cellar |
ZIEMANNROMAQUA SEBES 2007 – 2008 |
Executions and positioning for:Fermentation tanks, capacity 3790 HL – 15 pcs |
HOLVRIEKAALBRAU S.A., Onesti 2007 |
Executions and positioning for :BBT’s tanks , capacity: 1250HL – 4 pcsBBT,’ tanks, capacity: 2250 HL – 4 pcs |
HOLVRIEKAHeineken Zargorka BreweryBulgaria 2007 – 2008 |
Executions and positioning for:Fermentation tanks, capacity 5000 HL – 6 pcs |
HEINEKENMiercurea Ciuc Brewery 2007 |
Executions, positioning and complete instalation for:C.I.P.’s tanks, capacity: 146 hl – 5 pcsIntermediary tank, capacity: 600 hl – 1 pcs |
HOLVRIEKAEuropean Drinks 2007 |
Executions and positioning for:BBT’s tanks, capacity: 2490 HL – 8 pcs |
T.N.U.V.A.,Bucharest Diary 2007 |
– Complete installation of a new Diary. |
HEINEKENMalbera brewary CONSTANTA2007 |
– Positioning and complete installation of technological piping system– 10 cylindroconical tanks and 4 BBT– CIP station– filtration station– pipe bridges– water treatment station– water house |
HEINEKENBERE CIUC SA, M. Ciuc |
– Complete installation of technological piping |
TERAPIA S.A.Pharmaceutical Factory Cluj-Napoca |
– Complete installation of technological piping |
TUBORG,Bucuresti |
– Washer tank 15 m3 |
DORNA LACTATE, Diary Vatra Dornei |
– Tanks for milk reception 30 and 50 m3 |
FARMEC S.A.Cluj-Napoca |
– Tanks for stocking cream. |
HTIItalia |
– Tubular heat exchanger for pharmaceutical factory, 15 pcs. |
ANTIBIOTICE IASI S.A.Pharmaceutical Factory Iasi |
– Complete installation of technological piping for PW. |
SIGAT, BucurestiPEPSI |
– Complete installation of technological piping |
LACTAG,Giurgiu Diary |
– Complete design and installation of a CIP station |
INTERAGRO,Zimnicia Diary |
– Complete design and installation of a CIP station |
S.C. EUROPEAN DRINKS S.ABihor. |
– Complete installation of Water tanks and BBT tanks(HOLVRIEKA) |
S.C. KANDIA-EXCELLENT S.A.Bucuresti |
– Complete installation of technological piping for chocolate |
FRIESLANDNapolact DiaryCluj-Napoca |
– Complete installation of reception station for milk.– Complete installation of a CIP station |
FRIESLANDSatu Mare Diary |
– Design and execution of 200 pcs. of a cheese carriage. |
FARMEC S.A.Cluj-Napoca |
– Tank for cream, capacity 1 m3 . |
FRIESLANDCarei Diary |
– Complete design and installation of a CIP station |
S.C. KANDIA-EXCELLENT S.A.Bucuresti |
– Tank for chocolate, capacity – 3 mc.– Tank for chocolate, capacity – 10 mc. |
RARAUL,Campu Lung Moldovenesc Diary |
– Complete design and installation of a CIP station |
HEINEKEN S.A.APATIM BREWERY, Serbia |
– Complete installation of technological piping. |
KARLSBERG, Germany |
– Complete installation of technological piping. |
WILDGermany |
– Complete installation of technological piping for syrup |
BIOFARM SAPharmaceutical Factory, Bucuresti |
– Complete installation of technological piping PW, CS. (Gea) |
S.C. EUROPEAN DRINKS S.A Bihor. |
– Complete installation of technological piping. |
S.C. EXCELENT S.A.Bucuresti |
– Mobile Tank for chocolate. |
BELIZE AQUACULTURE Ltd,Belize, Central America |
– Complete installation of processing shrimps plant (York + ATM+ SIEMENS) |
Baileys, North Ireland |
– Complete installation of new technological system (GEA + ATM) |
LADYVILLE BREWERY,Belize, Central America |
– Complete installation of technological piping system (Steinecker + ATM):– extension |
S.C. EUROPEAN FOOD S.A.Bihor. |
– Positioning and complete installation of 2 mio Hl. New Brewery Plant. – Steinecker |
S.C. EXCELENT S.A.Bucharest. |
– Tanks for chocolate – 500 l. |
NEUHOLD GmbH, Austria |
– Different stainless steel parts and devices for water treatment plant |
UNILEVERMargarine Plant, Targu Mures |
– Complete piping and installation of new margarine plant(GEA) |
HEINEKENARBEMA, Arad |
– Tanks for cold water, hot water:40 m3 – 2 pcs.– Tank BBT 80 m3 for non-alcoholic beer– Complete piping and installation of new equipment for non-alcoholic beer |
INTERBREW EFES BREWERY, Ploiesti |
– Complete installation of centrifuge – GEA TUCHENHAGEN |
INTERBREWBeck&Co Brewery, BremenGERMANY |
– Positioning and complete installation of New Filtration Plant (Filtrox + ATM + Siemens) |
CERVECERIA NACIONAL DOMINICANA,Republica Dominicana, Santo Domingo |
– Positioning and complete installation of technological piping system (Steinecker + ATM):– pipe bridges– bottling and KEG lines– cooling station – amoniac and glycol– water treatment station– water house |
HEINEKENCIUC BREWERY , M. Ciuc |
– Execution, positioning and complete installation– cylindroconical tank borhot, Ø 4.000 x H 22.000 mm.,volume 160 m3 |
INTERBREW EFES BREWERY, Ploiesti |
– Complete piping system at canning line 35.000 cans/h. |
LADYVILLE BREWERY,Belize, Central America |
– Positioning and complete installation of technological piping system (Steinecker + ATM):– pipe bridges– bottling and KEG lines– cooling station – amoniac and glycol– water treatment station– water house |
HALC SA, Miercurea Ciuc |
– Complete system of 24 storage tanks for alchoolic drinks |
S.A.B. MILLERSC AURORA BREWERY SA, Brasov |
– Execute and mounting:– Cold an hot water tank, 100 and 200 m3– Tank for solution 5 m3 |
NEUHOLD GmbH, Austria |
– Different stainless steel parts and devices for water treatment |
SC ROBEMA SA,Rosiorii de Vede |
– Complete mounting of a flash Pasteur. |
DORNA LACTATE, Vatra Dornei Diary |
– Complete technological piping system for different food liquids and utilities. |
HEINEKENHABER INTERNATIONAL BREWERY SA, Hateg |
– Tanks:– warm water 150 m3 – 1 pcs.– cold water 80 m3 – 1 pcs.– last water 6,2 m3 – 1 pcs.– CIP tank 6 m3 – 4 pcs.– trub tank 3,5 m3 – 1 pcs.– Cooling plates for fermenting tanks – 80 pcs.– Brewhouse extension. |
HEINEKENGRIVITA INTERNATIONAL BREWERY SA, Bucharest. |
– Tanks:– warm water 150 m3 – 1 pcs.– cold water 80 m3 – 1 pcs.– last water 6,2 m3 – 1 pcs.– Boiling house extension– CIP tank 7 m3 – 3 pcs. |
ALUTUS BREWERY SA,Rm. Valcea |
– Positioning and complete installation of technological piping system(Leushuis):– cylindroconical tanks Holvrieka (4 pcs)– pipe bridges– brewhouse extension– Tank for used water 10 m3 |
INTERBREWPROBERCO BREWERY SA, Baia-Mare |
– Positioning and complete installation of technological piping system.:– cylindroconical tanks (6 pcs.)– cooling station: amoniac + glycol– high gravity system– pipe bridges– brewhouse extension– Deaeration water tank 20 m3 for high gravity system |
EFES PILSNER – COZLA SRL |
– Complete installation of technological piping system. |
HEINEKENSILVA BREWERY SA, Reghin |
– Complete installations for KEG line– Complete installations for flash pasteurizer.– Sterilisation tanks for different pipes. |
S.A.B. MILLERURSUS BREWERY SA, Pitesti |
– Cylindroconical tank for maltose 450 hl– Complete maltose technological installation: engineering, execution and automation. |
S.A.B. MILLERURSUS BREWERY SA, Buzau |
– Positioning and complete installation of fermenting and boiling houses– Cooling plates for fermenting tanks – 108 pcs.– Installations for fermenting extension. |
HEINEKENCIUC BREWERY SA, M. Ciuc |
– Positioning and complete installation of technological piping system.(Steinecker + Kieselmann):– cylindroconical tanks and BBT (24 + 6 pcs.)– yeast station, CIP station, filtration station– pipe bridges– water treatment station.– Execution of tanks for cold water, hot water, beer:140 m3 – 2 pcs.75 m3 – 2 pcs.80 m3 – 1 pcs.– Stainless steel platforms.– Execution of Bright Beer tanks BBT : 100 m3 – 8 pcs |
INTERBREWEFES BREWERY,Ploiesti |
– Positioning and complete installation of technological piping system (Steinecker + ATM):– pipe bridges– bottling and KEG lines– cooling station – amoniac and glycol– water treatment station– water house |
S.A.B. MILLERURSUS BREWERY SA, Cluj |
– Positioning and complete installation of fermenting and boiling houses and technological piping system (Holvrieca + Kieselmann):– Cylindroconical tank for maltose 750 hl– Complete maltose technological installation: engineering, execution and automation.– Cooling station – amoniac and glycol– Stainless steel platforms.– Sterilisation tanks for different pipes. |
TUBORG BREWERYBucharest |
– Positioning and complete installation of technological piping system (Steinecker + Sudmo):– cylindroconical tanks and BBT (16 + 6 pcs)– yeast cellar– CIP station– filtration station– compressed air station– heating station– pipe bridges– bottling and KEG lines– water treatment station– water house |
B. Bottling lines equipment.